Table 1

Project flow and follow-up items.

ProjectBefore treatment/baselinePeriod of treatment/intervention and follow-up (14 days)After the treatment/call-back
0 week (−5 to −1 days)1 week/day 72 weeks/day 14Within 4–8 weeks
Screening×
Informed consent×
Inclusion and exclusion criteria×
Medical history collection×
Vital signs××××
Randomisation×
Blood routine test××
Urine routine test××
Renal function test××
liver function test××
ECG××
14C UBT××
Stool H. pylori antigen××
Specimens××
Treatment and follow-up×××
Concomitant medications××××
AEs×××
Surplus medicines recycling×
  • The ‘×’ is the item or operation content that must be performed in the project.

  • 14C UBT, 14C-urea breath test; AEs, adverse events.