Table 6

Potential net programme cost for a future paramedic service implementing community paramedicine at clinic programme under different assumption scenarios

Potential programme costs—two intervention buildings (direct costs and staffing)
Minimum assumption ($18 461)Moderate assumption ($44 707)Maximum assumption ($70 952)
Potential cost offsets*Minimum assumption ($12 114)634732 59358 838
Moderate assumption ($39 474)(−21 013)523331 478
Maximum assumption ($54 720)(−36 259)(−10 013)16 232
Potential programme costs—four intervention buildings (direct costs and staffing)
Minimum assumption ($18 461)Moderate assumption ($66 703)Maximum assumption ($114 944)
Potential cost offsets†Minimum assumption ($24 228)(−5767)42 47590 716
Moderate assumption ($78 949)(−60 488)(−12 246)35 995
Maximum assumption ($109 440)(−90 979)(−42 737)5504
  • *Expected offset for two future buildings, based on the randomised controlled trial results of 157.8 fewer calls in 13 buildings, and a value of $499/call for minimum, $1626/call for moderate and $2254/call for maximum cost offset assumptions.

  • †Expected offset for four future buildings, based on the randomised controlled trial results of 157.8 fewer calls in 13 buildings, and a value of $499/call for minimum, $1626/call for moderate and $2254/call for maximum cost offset assumptions.

  • QALY, quality-adjusted life year.