Table 3

Procurement process comparison across the sample states

ParameterKeralaOdishaTamil NaduPunjabMaharashtra
Legal status of procurement organisationAutonomous (KMSCL)Government owned (part of DHS)Autonomous (TNMSC)Government owned (PHSC)Government owned
Drug procurement budget (USD)36.3 million (2011–2012)8.1 million (2010–2011)39.8 million (2010–2011)3.4 million (0.4 million state budget+3 million user fees)87.5 million (2010–2011)
Per capita drug procurement budget (USD)518.822.55.835.6
Essential drug list
 Customised state EDLYesYesYesYesNo, but it has a drug list comprising 1850 drugs
 Composition of EDL committeeMultistakeholder committeeMultistakeholder committeeMultistakeholder committeeMultistakeholder committeeMultistakeholder committee
 Frequency of EDL revision (years)1211N/A
 Time for EDL preparation/revision (months)2–37–82–34N/A
 EDL categorisationYes (8 product-based categories)Yes (2 demography-based lists)Yes (product-based categories)YesN/A
 Third party review of EDLNoYes (by WHO experts)NoNoN/A
Demand estimation and forecast
 Demand estimation processAggregation of facility indentsAggregation of facility indentsAggregation of facility indentsAggregation of facility indentsFacility-level indenting
 Frequency of demand estimation (years)11111
 Methodology for estimation (facility level)10–15% over previous year's indent; performed by pharmacistNo scientific method; usually performed by computer operator/clerk10% of the previous year consumptionN/A10% of previous year consumption
Procurement process
 Procurement mechanism in the stateCentralised80% centralised; 20% decentralised90% centralised; 10% decentralised12.5% centralised; 87.5% decentralisedCentralised rate contracting; decentralised purchasing
 Financing of drug procurementState budget allocationState budget allocationState budget allocationState budget allocation and user chargesState budget allocation
 Emergency drug budget allocationYes (additional funds released)No (purchased from existing budget)Yes (additional funds released)NoYes (additional funds released)
Tendering process
 Bidding processTwo-bid systemTwo-bid systemTwo-bid systemTwo-bid systemTwo-bid system
Prequalification criteria
 Minimum turnover criteria (INR/USD)10 crore/2.1 million10 crore/2.1 million3 crore/0.7 million50 crore/10.7 million10 crores/2.1 million
 GMP/WHO-GMP/US-FDARequiredRequiredRequiredRequiredWHO-GMP required
 ISI/BIS/ISO/CERequiredRequiredN/AN/AN/A
 Assurance of available production capacityRequired (MPMASS)NoneProduction capacity certificateN/AProduction Capacity Certificate
 Market standing (years)23333
 Exclusion criteria for factory inspectionsSupply to premier institutionsNoneNoneNoneN/A
 Price relaxation for SSIs/PSUsYes (SSI—10%; PSU—15%)Yes (SSI—10%; additional 3% for ISO certification)Yes (SSI—15%)PSU produced antibioticsNone (20% quantity reserved if SSI matches L1 rate)
 Product reservation for SSIs/PSUsNone31 items (from SSIs)NoneNoneNone
 EMD1% of tender value1–5% of tender value1% of tender value (maximum upto 50000 INR), exempted for SSIDiffers for each drugINR 25000
 Process for tenders with no bidders (in order of priority)Retender (revised prequalifications); limited tender; short tender; direct purchaseRetender (same prequalifications)—open until bids are receivedRetender (limited and short-tender process is used)Pharmacy-based purchasingRetendering, limited tendering or direct purchase
 Supply schedule60 days—40% of PO quantity; 90 days—70%; 120 days—100%60 days—50% of PO quantity; rest before specified dateStarting from 30 days and has to end by 60 days, otherwise specified30 days to 3 months from the time of issue of POWithin 3 months from the issue of PO
Quality control
 External quality testing of every consignmentEmpanelled private labsNo external quality testing (supplier's internal quality certificate)Empanelled private and government labsEmpanelled government labsNo external quality testing (supplier's internal quality certificate)
 Testing before distributionMandatoryNot mandatoryMandatoryMandatoryNot mandatory
 Lead time for quality testing∼15 daysWithin 8 weeks15 days for tablets and capsules; 1 month for suspensions1 monthN/A
Payment mechanism
 Payment department statusAutonomous (managed by contractual staff)Government (Account General's Office)Autonomous (managed by contractual staff)-IT enabledGovernmentGovernment (Directorate of Accounts and Treasuries)
 Lead time for payment (days)∼30∼9030Minimum 30∼90
 Pre-requisites for payment disbursementWarehouse material receipt, external quality certificateWarehouse material receipt, supplier's internal quality certificateWarehouse material receipt, external quality certificateWarehouse material receipt, quality certificates from labsFacility material receipt, internal quality certificate
Inventory management and distribution
 Facilities (All) catered to per warehouse (average)∼290∼235∼411N/AN/A
 Scientific warehousing practicesYesNoYesNoNo
 In-house/outsourced supply chain managementOutsourcedIn-houseIn-houseIn-houseIn-house (facility level)
 Inventory managementDynamic (flexibility of second PO)Static (only single PO is issued)Dynamic (flexibility of second PO)Static25% flexibility for quantity maintained
 Scientific consumption/inventory forecastingYes (inventory management software)NoYes (inventory management software)NoNo
 Flexibility for facilities to alter indentYes (just before dispatch)NoYesYesNo
 Tracking dispatched/delivered drugsCurrently passbook (volume based; online in future)No trackingPassbook (value based)N/ANo
 (Scientific) Inventory management at facilityNo (online in future)NoUse first in first out (FIFO) principleNoNo
Penalty
 Penalty for supply schedule default10% of the unexecuted supply; unexecuted supply purchased at the cost of supplier in case of inability to supplyN/A0.5% per day to maximum of 15% of the tender amountN/A0.5% of the value of unsupplied goods per week up to 5 weeks, after which unexecuted supply purchased at the cost of supplier
 Penalty for quality failureSupplier blacklisted with forfeiture of security depositSuppliers have to replace the entire PO quantity or risk blacklistingSupplier blacklisted with forfeiture of security depositForfeiture of EMDSupplier blacklisted with forfeiture of security deposit
 Blacklisting criteriaDefaulting on 3 POs or more with less than 50% supply; blacklisted by any other procurement agency on quality groundsQuality failure after material supplyDefaulting continuously on 3 POs with less than 50% supply, quality failure, blacklisted by national or other state level agenciesDefaulting continuously on 3 POs with less than 50% supply, quality failure, blacklisted by national or other state level agenciesSupply default after extension period; quality failure
IT enablement processes
 Demand estimation & forecastingYesNoYesNoNo
 Tendering processYesNoYesNoYes
 Quality controlNoYesNoNo
 Payment disbursementYesNoYesNoNo
 Inventory management (warehouse)YesYesYesNoNo
 Inventory management (facility)NoNoYesNoNo
  • PO,purchase order; PSU,Public Sector Undertaking; SSI,Small Scale Industries.